INDUSTRIAL EMISSIONS CONTROL TECHNOLOGY X CONFERENCE
TECHNICAL SEMINAR
| A. | MINI WORKSHOPS | ||
| A.1. | ERM Compliance Workshop | ||
| A.2. | EPA Data Base Evaluation for Compliance | ||
| B. | FORUMS | ||
| B.1. | Informal Owners’ Only Forum – See summary | ||
| B.2. | Informal Equipment Suppliers, Engineering and Environmental Service Consultants’ Only Forum – See summary | ||
| B.3. | Review of Concurrent Forum Discussions – See summary | ||
| C. | State & Federal Officials Shirt Sleeve Information Session (see summary) | |
| D. | Short Course – Basic Principles of Combustion that Affect Plant Operation and Ultimately Affect Emissions Produced | |
| E. | Environmental Rules, Regulations and Implementation in the Industrial Sector A Panel Discussion | |
| E.1. | US EPA Boiler and Utility Rules Lost in Space | |
| E.2. | Stationary and Area Source Committee Activities | |
| E.3. | State of Maine | |
| E.4. | SNCR and I-NOx TM Systems for Industrial Boilers | |
| E.5. | Regulatory Update | |
| E.6. | Implementing Environmental Rules | |
| F. | Particulate & Multi-Emissions Control Technologies for HCl, SO2 and Hg Compliance or Advantage Back-end Technologies to Meet Future Regulations | ||
| F.1. | Emission Control Systems at Virginia Tech | ||
| F.2. | Lextran Panacea for Small Boilers | ||
| F.3. | Mercury Removal in Dry Scrubbers Coal-Fired Generators with Amended Silicates | ||
| F.4. | Boiler MACT and ESP Particulate Removal Performance | ||
| F.5. | Operating Results from Biomass Project – Sample Case Presentation | ||
| G. | Sorbents and MACT Compliance Possibilities A Panel Discussion | |
| G.1. | Calcium DSI for Acid Gas Control | |
| G.2. | Meeting the New EPA IBMACT and MATS Rules | |
| G.3. | The Activated Carbon Landscape has Changed | |
| G.4. | Carmeuse Lime & Stone, Inc. – See summary | |
| G.5. | Meet HCl Challenge from Industrial Boiler MACT | |
| G.6. | NatronX Technologies – See summary | |
| H. | Choosing the Right Bag Filters | |||
| I. | Complying with Boiler MACT | ||
| I.1. | Boiler MACT Compliance Requirements for Area and Major Sources | ||
| I.2. | Environmental Auditing Compliance in the Here and Now | ||
| I.3. | CEMs/COMs QA Planning | ||
| I.4. | HCL Monitoring | ||
| I.5.a | CEM’s Technology Analytical Solutions | ||
| I.5.b | CEMs Technologies and Sampling Fundamentals Hg Monitoring and Data System Trends | ||
| I.5.c | Dilution Full Extraction | ||
| J. | Complying with Work Practice Standards for Boiler MACT | ||
| J.1. | Area Source Boiler Tuning Considerations | ||
| J.2. | How One Company Does Energy Assessments | ||
| J.3. | Boiler Tune-ups & Assessments: Tips, Traps & Opportunities | ||
| J.4. | Combustion Technologies to Achieve MACT | ||
| J.5. | CHP – Profitable Solution to MACT | ||
| J.6. | Maintaining Fuel Flexibility with Grate Fired Boilers | ||
| J.7. | DSl and ACl Demonstration Testing with a Rebuilt ESP | ||